Quantcast
Channel: SCN : All Content - SAP for Utilities
Viewing all articles
Browse latest Browse all 3025

Meter Reading Interpolation after receiving actual read between estimated reads.

$
0
0

Hi All,

 

I have a requirement where i need to interpolate meter reads between two actual reads when required.

 

For example, an actual read was received on 01.01.2015 and estimated reads were received on 01.02.2015, 01.03.2015 and 01.04.2015 and again an actual read was received on 01.05.2015. Now the meter reading should be interpolated for the periods where this was estimated after adjustment reversal is performed for those periods.

 

I have looked into assess workflow but i think that works only if my actual is less than the estimated read.

 

How can i achieve this ?

 

Regards,

Monis Shakeel


Viewing all articles
Browse latest Browse all 3025

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>