Hi Experts,
My client requirement is as follows :
Monthly Portion, hence period length = 1 month
Tolerance limit should be checked based on last 12 periods. It will be relative tolerance check.
However in SAP maximum comparison period is 9. Can anyone suggest a solution which can be met by configuration?
Waiting for an early response.
Thanks,
Madhurima