Quantcast
Channel: SCN : All Content - SAP for Utilities
Browsing all 3025 articles
Browse latest View live

Move out issue

Hi Guru,I am trying to do move out and device removal same day but it is not possible in the system.Please let me know where i have to do setting in customizing level so that above functionality will...

View Article


Cheque number not getting generated in FPY1

Hi, I am trying to generate cheque number for outgoing payments using FPY1. I have followed the steps mentioned in the below link. outgoing cheque payment through FPY1 | SCN But the cheque number is...

View Article


Image may be NSFW.
Clik here to view.

Invalid date in EVERH()

Hi guys, Can someone walk me through how to resolve a CRM contract which didn't replicate properly in the back-end? Below is the screenshot:

View Article

Image may be NSFW.
Clik here to view.

How Will We Power 10 Billion People By 2050?

How Will We Power 10 Billion People By 2050?  Henry Bailey The utilities landscape is changing. Experts predict that the global population will increase to 10 billion people by 2050. Entire countries...

View Article

Image may be NSFW.
Clik here to view.

Interpolating the move-in meter reading in SAP IS-U Device Management

We had a requirement in our project to interpolate the move in read based on the move out reading. The move-in was performed a day after the move-out and it was required to copy the move-out reading...

View Article


Is Clarification GL required for Return lot posting FP09 ?

Hi Experts, I would like to know how to handle following scenario When we post returns using Return lot  FP09 transaction -  But i am trying to post without Clarification GL account  but system is...

View Article

Possible to consider Meter Overflow Dynamic Period Control

Hi Experts, Is it possible to control meter over flow during DPC Billling. The scenario is as follows: 01.01.2015 Actual Read 001.02.2015 Estimate Read 400  Consumption 40001.03.2015 Estimate Read 700...

View Article

Image may be NSFW.
Clik here to view.

Meter reading assesment issue

HI Guru,  i have faced the issue during Meter assesment process,iam trying to do below senerio but it s not reestimating the reading.V2 (100) < V1 (9990) => No assessing requiredA reestimation...

View Article


Image may be NSFW.
Clik here to view.

No Business Area in FICA doc for Sales Invoice

We have a issue where we observe inconsistent behavior in the system regarding business area being populated for Sales invoice in FICA doc. Let me explain it with an example:We have 2 identical Sales...

View Article


Bdoc Error for validity periods of address usages R11 245

Hi,we are getting the same error, and after doing some analysis we found a scenarion when a future dated validity address is changed to current date or past date the system is throwing this error wile...

View Article

Update Connection Object Address in Background

Hi All, Can anyone throw some light on how to update Connection Object Address in background. I tried with 'ISU_S_CONNOBJ_CHANGE' but, it can't work in background.    Thanks & RegardsSuresh M

View Article

Configuration Help for Schema Steps in DPC in SAP ISU

Hi,    I have Completed all Configuration Changes for Dynamic Period Control Implementation and when i have billed with Actual - Estimate - Estimate - Actual Meter Readings but the in the Last invoice...

View Article

Instalment plan print FPR1

Hi experts, My client is facing issues with agents who are creating instalment plans through FPR1 but are not consistent in printing them. Sometimes they are cancelling the print form option which...

View Article


Image may be NSFW.
Clik here to view.

Part 2 - Interpolating the move-in meter reading in SAP IS-U Device Management

Background: This is the second part of the series Interpolating the move-in meter reading in SAP IS-U Device Management . Here I would like to describe the technical fix required to achieve the...

View Article

EDM Settlement Procedure

Hi, We have copied the standard settlement procedure EXTANALYT (Enhanced Analytical Settlement Procedure) into a custom procedure ZEXANALYT and tried executing a settlement document. But we are getting...

View Article


Image may be NSFW.
Clik here to view.

FICA-Fund Managment Issue

Hi All,while i am Posting  return lot through FP09 getting below error, i.e i have maintained the FMDERIVE rules for below combination.M/S  0070/0010 &0020 with FUND, FM AREA and FUND...

View Article

Real-life documentation

Good afternoon everybody! In order to extend my knowlege in EDM and DM, I´ve been searching a while for some good (not too basic) documentation and typical use cases regarding the following modules:...

View Article


Low Income Donation - Post receivable as Statistical item

We are planning to implement Low income donation program , where the customers can voluntarily contribute additional amount with their bill payment as donation towards low income group. We are planning...

View Article

Reconciliation Key

Hi Everyone,  We have encountered an issue in a report that shows collection of payment. This issue is due to the reconciliation keys that didn't push through in posting since the payment file has...

View Article

"Dismantling may not be earlier than XX/XX/XXXX"

Hi SAP Experts, May i know your stand on this error that i have encountered upon replacing a meter. While transacting a meter replacement via EG30; we encountered an error that says, "dismantling may...

View Article
Browsing all 3025 articles
Browse latest View live