Quantcast
Channel: SCN : All Content - SAP for Utilities
Viewing all 3025 articles
Browse latest View live

Featured Content for Utilities

$
0
0

SAP for Utilities North American Conference

 

The North American Utilities Conference takes place in Huntington Beach, California on September 15-17, 2013.

 

This conference is the most comprehensive SAP for Utilities conference in North America. It showcases the most important stories, case studies, and best practices for the successful use of SAP solutions for Utilities.This year´s theme is Designing the Modern Utility. Register now!

 

For more information, see website or read this blog.

 

SAP_for_Utilities_North_America_2014.PNG


Infosession: Real-Time Unified Customer Engagement for Utilities, Sep. 5, 2013

$
0
0

Real-time unified customer engagement for utilities

September 5, 2013; 5 PM CET/ 11 AM EDT/ 9AM PDT

In the past, utilities primarily communicated with customers  through their bill. Today, there are new requirements to interact with
customers in real-time. The smart grid enables new products and services,  e.g. pre-paid services that require real-time information. Deregulation demands quick responses to market requirements or competitive programs.
Political and customer pressure dictates to keep customers informed in a timely manner about planned and unplanned events, e.g. outages and restoration, or customer related threads like bill scams. Increased focus on   energy efficiency campaigns and demand response programs requires   personalized customer engagement across multiple channels. Managing traditional and new channels like mobile and social in a consistent manner presents a growing challenge.

 

But how can utilities empower their business to engage customers in real-time?

 

We will discuss best-practices and solutions to engage customers like-never before with SAP and OpenText - personalized, multi-channel, and real-time.

 

Join this webinar to learn: 

    • The business value of managing relevant and timely customer interactions
    • Best practices to ensure consistency of customer messages across your business
    • The importance of customer information quality
    • The growing role of content in delivering personalized customer experiences
    • New solutions for SAP CRM to engage customers like never before with enhanced digital asset management, customer account and communication management, and real-time notifications

 

>>LINK to registration

Create Custom Node in ISU MDT (Category CRMNEWCONTRACT)

$
0
0

Hi Experts,

I have a requirement to create two new contracts using one MDT i.e of category CRMNEWCONTRACT.As we know one MDT type CRMNEWCONTRACT can create one ISU contract only.So we are trying create a custom node coping the node Create Contract for Move in create node in the MDT ,but system says unable to support the function.Just wondering if this is right way to copy and create a new custom node in the MDT .Please help me out here to resolve this.

 

Thanks

Snehasish

Bapi to Display to Contract

$
0
0

Hi,

 

I working on the web portal, and have the requirement to fetch the contract data like Utility type, start date,end date from the SAP.

But unable to figure out any bapi for the same.

 

Kindly suggest.

 

Regards,

AnUrAg

Due Date Configuration

$
0
0

Hello SDN Experts,

 

I have requirement to allow customers to have their preferred due date/s (limited window for ability to move due date). I would like to know how this configurations can be done in the SAP? Do I need any development for this?

 

Thanks for your help.

Group Type not available - Installation Groups

$
0
0

Hi

 

I'm experimenting with Installation Groups and have done the minimum configuration from the SPRO node

"Define Billing Rules for Installation Groups" , such that the validation report for the Grouping Type returns "Customizing for Installation Groups Is Consistent".

 

I'm trying to define an installation as primary within a group, but only the fields for secondary installations are available for updating within the installation timeslice.

 

Is there some other configuration I'm missing?

 

Thanks

Astrid

Remove paypal from Dunning procedure.

$
0
0

Hi Experts,

 

CAX:-Non standard Industry based

For Online webshop

 

I have the system setup in which standard dunning procedure is assigned at the contract level.

At each order level, there is a specific dunning procedure maintained based on payment method etc... In which the particular order gets dunned with the dunning procedure maintain in 'dunning data' tab at the positon level.

 

Here the dunning procedure XY is used for payment method Bill, Immediate money transfer, Paypal etc..

 

Is there any simple way to remove paypal from dunning procedure XY without much changes in the current setup.

Removing a Reversed Invoice from CIC0 Billing History Screen

$
0
0

How would I go about removing an invoice that was reversed, but still showing under "Billing History" on the CIC0(Customer remove cancelled bill from CIC0 (Customer Information Center) screen?

 

I have verified that the Billing Document and the Print Document has been reversed but on the Billing History section on the CICO screen displays the Reversed Billing document and the New Billing Document. 

 

This new document now has a total amt due of $7,670.24 at the top of the statement but $3,843.04 on the bill stub.  This should not be.  Please advise. 

 

Thanks.


SOST entry is missing

$
0
0

Hi Experts,

 

I have a typical problem, The job for creating ratenplan runs at 19 in the evening. WIth this job customers are informed about their installment plan. For few customers, there is no entry in SOST.

 

How to proceed in such cases or where to start with? Unfortunately the entries in SOST are archived, I could not even find the data

clarification Needed Regarding Disconnect ISU

$
0
0

Hi Experts,

 

We need your help regarding an issue.

 

We are troubleshooting a disconnect workflow and  an exception is being thrown while creating  Create of Disconnection Order [DARK]  is being made via standard method [DARKCREATEOFDCORDER] of buisness object 'Dosconnect'  .

 

 

The following exception is being thrown

''No objects that can be disconnected in the data environment of ref. obj'   , now we  found the following details while searching deatils

reagading creation of disconnection order,

 

 

Prerequisites

If you want to generate a disconnection order, the disconnection document must have a reference object containing devices or flat-rate installations in its data environment.

In the event that open item accounting is blocked, the contract account must contain at least one current contract when the disconnection order is generated.

 

we really do not have any idea regarding ISU functional side and disconnection. as per we understood the above exception might have been thrown

due to the absence of reference object for the disconnect document. This reference object should have been created for the disconnect object and which

should be done manually / via transcation.linking . Its'  a maintained data issue with the disconnect document.

Technically the standard sap method [DARKCREATEOFDCORDER]use the Function module  'ISU_S_DISCDOC_CHANGE'   and it should work if the

data are maintained properly.

 

Please help us in providing the inputs regarding the same.

 

Thanks  a ton in advance.

Reset first mandate usage during Return lot processing

$
0
0

Hi experts,

 

With first payment run with active mandate, the status is moved from FIRST to RECURRENT.

When a payment fials for whatever reason, banks inform us that the payment/mandate failed and mandate should be resend as FIRST.

 

How can I reset the mandate usage during retunr lots processing, using the CODA from the bank ?

 

I read on this forum that we can use transaction FSEPA_M4 which is manual processing for only one mandate. I need a mass processing for reset mandate usage.

 

I want to do it autmatical during the return lot processing. I found  'SEPA_MANDATE_DELETE_USAGE' which is not working.

 

I implement note 1693619 and activate event 575 but still not wotking.

 

Thanks for any idea.

 

Thierno

Meter Reading validation

$
0
0

Dear  Device Management Experts

 

I have query regarding Meter reading validations

 

 

I need to put validations for meter reading  by giving positive and negative deviation for the average of last 2 months  6 months 12 months

 

here the problem is if percent of deviation is not same for all the three time periods

Ex for 2 months it is 80 percent

           6 months it is 50 percent

          12 months  it is 25 percent

standard setting is possible if deviation is  same for all periods

 

How can we resolve this

 

Reading should become implaus  if it is crossed deviation

 

 

Example  :  present consumption    : 100 units

                     2 months avg    consumption : 50 units   pdv : 90 and ndv 10 (80 percnet)

                    6 months avg    consumption : 40 units   pdv : 60 and ndv 20 (40 percent )        

                    12 months avg    consumption : 60 units   pdv : 75 and ndv 45 (25 percnt)

 

 

so my consumption should be  between 90  and 20  else it should be impluas

 

pl let me know how to resolve this (reading should be impluas immediate  when we enter reading in el28 and press enter)

Information about any certification for utilities

$
0
0

Hi,

I am new to utilities and currently working in a project based on it.I wanted to know as there any certification for SAP ISU and what is the fees for it provided by SAP.

please guide me on this.

Thanking you.

Regards,

sausap

SAP Work Management - GIS Integration in a Utility industry

$
0
0

This document talks about the details of integration between SAP Plant Maintenance and GIS (any product by ESRI). The following details are covered in this topic

 

- Introduction

- Use of GIS system at a Utility

- Use of SAP ERP system at Utility

- SAP EAM Compatible Unit Solution

- Interface between sap gis system

- Business benefits of Integrating two systems 

 

Introduction:

 

In  recent years businesses have been striving to optimize their processes andimprove efficiency by using highly integrated ERP systems like SAP for work management/financial management and GIS for map based information management.   Many advances have been observed in both fields; however the integrationbetween these two systems is highly complex. This results in lost opportunities
to leverage spatial analysis capabilities of GIS and highly integrated business management tools of ERP systems such as SAP. This paper discusses theindividual capabilities of each system and the integration approach of SAP ERP
system with GIS. The paper discusses the benefits gained from SAP/GIS  integration and highlights the major integration aspects involved in theseprocesses. We will also consider the technical approach used for interfacing the two systems. This paper will focus mainly on integration between SAP andAsset Management/Work Management (Plant Maintenance).

 

 

The following industries mainly make use of GIS systems:

 

 

  • Utilities – Water, Electric, Gas, Waste &
    Recycling
  • Energy – oil and gas production
  • Public Sector entities (like cities and
    states) also make extensive use of GIS systems

 

 

 

 

 

 

This paper focuses on the unique principles of a utility company but the principles would remain the same for other businesses.

 

 

The following are the main touch points between SAP and GIS from Utility perspective:

 

 

Asset Integration:

 

 

This is mainly used in the Utility and Construction Industry. The assets/equipments could be created in SAP and sent back to GIS.

 

The example of the above would be that a Utility pole could be created in SAP and then automatically represented in GIS. The GIS
users can directly view the ERP data of that pole in the GIS system.

 

 

Routing/Network Tracing:

 

 

This feature is mainly used by Service Providers:  Routing & Logistics industry, Utilities,Oil and Gas production etc.The ability to identify assets closest to addressinfo provided by caller – then be able to trace the network to see the flow of  the commodity (water, gas etc) and identify other customers that may bepotentially affected – e.g. nearest main and other addresses connected to thatmain

 

 

 

Design and Estimating:

 

 

The designs can be used in construction and Utility industry.The following are the main SAP touch points during integration:

 

  • Plant Maintenance – Equipment Master,
    Functional Location, Compatible Units, CU Design, Work Orders
  • Supply Chain – Material Master, Compatible
    Unit
  • Finance – Reconciliation (Indirect relation)

 

GIS in Utility Industry:

 

In the Utilities Industry, GIS is used for real time management of utilityinfrastructure and operations. It is a tool for map-based information
management, utility outages, creation of new assets (new construction jobs),field staking, inspection etc. In the Utilities industry, mapping and geographyare instrumental elements in most decision making processes. All of theprocesses around new infrastructure and outage management are driven by themaps. GIS brings together graphical representation of natural objects (e.g.trees, houses, wells, roads, etc), with attributes of these objects as well astools to manage the behavior of the map objects. This combination allows GIS togo far beyond the management of “background” mapping as it provides truepositional awareness in support of conducting analysis across multiple sources of information.

 

Whenit comes to integrating the GIS system with SAP, the following are the mainchallenges

 

  • Asset Identification and linking
  • Assembly units (basically the labor costs for Installs, Removals and material cost) in
    GIS used for new designs
  • New Asset creation and keeping the infrastructure for both systems in sync
  • Outage Management

 

 

The two main functions we are going to consider here in GIS system are

 

1. New Construction

2. Map updates

 

The main use of the GIS is for new construction jobs, i.e. staking the new job andbuilding new lines. The second important function is keeping the map in sync with the actual equipment out in the field.

 

Let us see the two different functions now, and the way they are performed in GISsystem

 

For the new construction jobs, GIS needs information for the labor and material for.the various actions they perform such as Install/Removals for the constructionThis information is maintained in terms of assembly units. Theinformation of assembly units is shipped from the enterprise application systemsuch as JDE, Maximo, SAP, etc.

 

New Construction jobs

 

The typical construction job is done,from take off pole location.The lines are constructed based on the pole locations above. Once the job is drawn with required assembly units, the system gives anassembly units listing along with the cost estimate report.

 

 

 

The second important function from GIS is to represent the structure or network of the installed equipment. The equipment is displayed
and managed on maps. The way the functionality is managed is referred as “MapEdit sessions” in GIS.

 

 

Use of SAP system at Utility:

 

SAP PlantMaintenance is one of the basic modules implemented by Utilities. The workmanagement functionality of master data management (Equipments and Functional location), Notification, Work Order management and Compatible units is used by a Utility


SAP implementations  increase the ability to make clear business decisions and eliminating processbottlenecks in the Utility industry.

 

 

Work Management – Helps organizations manage their assets more efficiently. It keeps the track of preventive and maintenance history and thus helps in decision making process around scrapping of an asset. In conjunction with Project system module it also helps to manage the complex projects using WBS, Compatible unitsetc.


SAP EAM Compatible Unit Solution:

 

The enterprise asset management module (under corporate services) helps in predictivemaintenance, maintenance cost budgeting, maintenance execution, and work-clearance management.

 

 

The Compatible Unit solution within SAP EAM helps mainly with construction work andacts as a tool for creating and maintaining equipment master data. Thisfunctionality resembles to GIS in that certain attributes of the equipmentmaster are maintained in both EAM as well as GIS.

 

 

Introduction to Compatible Unit Functionality:

 

 

  • Predefined standard design templates containing Materials, Labor, 
  • Resources and Tools required to completestandard Work Orders 
  • Example: Install,Remove, Transfer 40 feet pole.
  • New Service Installation.
  • CUs helps designers and engineers to more quickly and efficiently and estimate work to be performed
  • CUs are predominantly used by Utilities, but not exclusively

 

 

The overall design process in SAP is described below

 

CU Library:

 

 

See the attached document for image

 

The CU master  data carries the task list, classification andreference object type information.

 

 

CU Design:

 

 

See the image in attached for CU Design

 


CU design with different Compatible units and associated CU actions

 

Cost on CU Design:

 

See the image in attached document.


The cost estimation/reporting on CU design.

 

 

CU Work Order from Design:

Work Order created from CU design for execution of work (See the image for detailed CU process)

 

Equipment Master in SAP:

 

Equipment Master Data maintained in SAP

 

Classification data is maintained on Equipment

 

 

Interface Between SAP – GIS system:

 

The following Interfaces are typical between SAP EAM and GIS:

 

See the attached document for details

  • Outbound interface to send CU master data from SAP to UC (what’s UC??)
  • Outbound interface to send the equipment master data to UC
  • Inbound interface to create CU design from UC in SAP and update the same
  • Inbound interface to send the ‘AS BUILTS’from UC job to the SAP work order
  • Inbound interface to send equipment updates (change in characters or feeder) to SAP
  • One more Interface was set up with OMS system to create notifications on affected pieces of Equipment

Important Facts and Consideration for above interfaces:

 

Interface between SAP and GIS to maintain master data of Compatible Units – Outbound

 

  • This is an outbound interface sending out the data of the Compatible units from SAPto GIS system. The CUs will be required in GIS for new construction job
  • The important fields to be sent to GIS from SAP

       1.Compatible Unit id
       2. Cost associated with each CU. The major costs are labor cost on Install andremovals of Compatible unit for a job. This will also
           include the material cost.

Main considerations:

In order to synch the two systems it is recommended to maintain the same namingconvention for the Compatible Unit in both systems.

 

 

Interface between GIS and SAP to send the Compatible Unit design from SAP – Inbound

 

  • This is the most critical interface in the whole set up. This interface sends thenew design created in GIS to SAP.
  • As shown above in the screen shots, the GIS system creates new construction job (see image)basically on a feeder. The location 1 shown above is the take off polelocation, where the new construction begins. Each location on the feeder isdenoted by separate locations (location 2, location 3 etc) where the differentCompatible units are installed to complete the job.
  • Important fields to be sent from GIS to SAP

       1.Compatible Unit id
       2.   Quantity
       3.   CU Action
       4.   VCU (Locations)

       5.   Pri key id (the physical location or  X,Ycoordinates on GIS side)

       6.   Equipment Id (in case of existing equipments, equipment id will be maintained on GIS sidefrom SAP)

Main Considerations:

 

  • The CU Action and CU ids are important. The location (take off pole position –feeder id) i.e. the functional location in SAP is important for automaticcreation of new equipments (once the order is created)
  • The most important thing to take into consideration is that the functional locationhierarchy in SAP should not replicate the geographical locations on GIS side;otherwise it will become a nightmare to maintain two systems in synch. Thefunctional location on SAP side can be based on intelligent grouping ofEquipments, based on object types like Poles, Transformers etc. The feeder id
    can be maintained as a character on Equipment side, to identify the feeder/functional location on SAP.
  • The pri key id will act as a common identifier when the Equipment is created.


Interface between SAP and GIS to maintain technical object master data in synch – Outbound

  • Thisinterface will send the Equipment ids created from new construction job back toUC. The pri key id acts as a unique identifier between the two systems andplugs the unique Equipment id on GIS side.

 

Main Considerations:

  • As mentioned above the structure of functional location and equipment is veryimportant.The proposed structure will rely on GIS to
    update SAP with any permanent circuit changes. This will ensure that thefunctional location structure always remains accurate while still reflectingthe dynamic nature of the circuit network. This can be achieved by updating theindividual equipment’s distribution feeder number that will be stored as acharacteristic with the circuit change. Temporary circuit changes, such asseasonal load adjustment will not be reflected in SAP, since these are not permanent as-built changes to the network
  • The end-state structure
    should be Substation and Distribution Feeder driven. This will allow cost roll-up at the circuit level for
    better reliability investment decisions, as well as,
    providing better performance analysis.
  • The above will make sure that both systems are in synch. The Equipment id has to be maintained on the GIS side.

 

Interface between GIS and SAP to maintain technical object master data in synch – Inbound (Mapcorrections in GIS) 

 

  • This is an inbound interface. Map corrections/circuit changes always happen in GIS.It is required to maintain the structure in two systems in synch. Thisinterface basically sends the theme layer (object type of Equipment in SAP) and
    the associated attributes like pole height, class or the rating of thetransformer.


Main Considerations:

  • The main consideration is minimizing the attributes in SAP and GIS system. All theattributes in GIS system are not always required in SAP. Also the data comingfrom GIS should be classified as a new construction or a map correction job. This
    is important as in map corrections there will be no need of creating new equipments.


 

Benefits of integrating two systems:

 

  • Some Important benefits are as follows:

 

    • Increase asset data integrity
    • Effective financial reporting and meeting regulatory requirements
    • Increase end-user productivit
    • Increase work order manageability and reporting
    • Capitalize on information input into one system utilized in both with efficiency
    • Supply chain integration with work management

 

Increase Asset Data integrity

                - SAP and GIS databases reflect same data

                - Equipment number tracked in GIS
                - Eliminate lost, duplicate and obsoleteasset data

                 -Support reliable reporting and decisionmaking 

                - Proper tracking of refurbished equipment

 

Effective financial reporting and meeting regulatory requirements

                 - Automatic Financial reconciliation basedon the data from GIS

                 - Segregate the Capital and Operationexpenses on same job

                 - Effective Compliance to FederalReporting – FERC and other reporting requirements 

                 - Automated settlement to correct Asset

                 - Ability to capitalize (settle) workorder costs by expense type (labor, material, overhead etc). CAPEX and
                   OPEX distinguished

                 - Automation of  periodic asset transactions like assetunitizations, Cost of removal, retirements and other adjustment postings

 

Increase End User productivity:

                - Find SAP asset data (equipment)instantly from the map

                -View equipment details on the map

                - Create/update SAP assets from themap

                - Dynamically link map features toSAP assets in realtime

                - Doing job once in GIS and updatethem in SAP through interface

                - Submit ASBU (As Built) in GIS and update SAPwork order through interface

 

Increase work order manageability and reporting:

                - Automated process of creatingdesign in SAP

                - Multiple designs can be createdfor same job

                - Same jobs tied with ConstructionMeasure

                - ASBU (As Built updated) updatedon Work Order

 

Supply Chain integration with work management:

               - Compatible Units provide forstandardized planned and actual materials and costs on the work ord

               - Planning materials on work orders createsreservations in the warehouse which gives storekeepers  visibiltyto upcoming need

              - Scheduling of the work order materialsallows the Material Requirements Planning (MRP) portion of SAP to automate
                 replenishment of warehouse inventory

Custom FM for clearing

$
0
0

Dear Experts,

 

I want to develop a custom FM for clearing (with the interface of FKK_SAMPLE_TFK115). Basically I want to assign clearing amount available to different items in table T_FKKCL_E115.

 

What should I do to define a fixed amount to some line item in table fkkcl

 

Say I have 2 open items in account

 

 

Amount       Main Transaction      Sub transaction

100          6000               0010

200          6000               0020

 

Say consumer makes a payment of 100 and I want it to clear the amounts above by 50(i.e equally between open items) then  as per the documentation of the FM  FKK_SAMPLE_TFK115 i should do this

 

Loop at t_fkkcl_e115 where betrw > 0

E_AUGBW_E115 = u201850u2019

E_XAKTP_E115 = u2018Xu2019

Endloop

 

But this code is not working. The system posts a credit open.

 

What could be the reason?


How to stop Interest Calculation for moved - out contract accounts

$
0
0

Hi, can anyone let me know how to stop interest calculation for moved - out contract accounts.

Same Installment Plan Number Assigned To Two Business Partners In SAP IS-U

$
0
0

Hello Experts,

 

We are facing the error that one Installment plan number has been assigned to two business partners wrongly. We were creating the installment plan for a BP as per our usual business practice. However after creating one installment plan when we created another installment plan system created the new installment plan under same number. The difference between the transactions were maximum 3 min. Our end user uses the Customer Service module for their processing.

 

Regards,

Anurag s

Change existing security deposit and post a new recievable

$
0
0

Hi Experts,

 

I want to change the existing security deposit's request amount.For this purpose a new recievable for the existing security deposit must be posted. Can anyone please help me with a FM that can be used for the same.

 

          I tried this FM FKK_POST_SECURITY_WITH_TAX and i am able to post the new recievable as well but its not coming under the the existing security deposit instead its getting posted as a seperate new recievable of security deposit.

 

Regards,

Rahul.

FPR1 Functionality

$
0
0

     Hi

 

Currently FPR1 is not active in the business, as payment plans are all maintained in excel spreadsheets.  I am researching the feasibility of activating FPR1 and promise to pay functions.

 

From the research I have done on the internet, I can see how you can enter the instalment plan against the CA number, however I cannot ascertain if payments subsequently made by the customer can be seen. 

 

So my questions are, are the payments made by the customer seen when viewing the payment plan.

What reporting is available - eg, instalment plans not being paid

 

thanks in advance.

 

Regards

Alternative Label issue during integration with IS-U

$
0
0

For integration with ISU, I had to define further sublevel of Functional Location. When the FL label size became more than 30 char, it gave the message that only label with 30 char is supported, but as per the length of functional location it can support 40 char if alternative label is activated. So, I activated the alternative label. It worked fine, as I were able to define desired sub-level of Functional Location.

Problem is that while executing t-code ES55 to create connection object, it gives error that Alternative Labelling is not supported. Can anyone suggest how to overcome this error.

The above I have just done in the development sandbox, hence I can try some new suggestion to resolve it.

Thanking you.