EL30 - Only showing open meter reading orders

Hi All,

 

 

I have a query regarding EL30. My clients wants the option of estimating all implausible MRs at one instance rather clicking estimate repeatedly (as in case of EL27) . However in EL30 I am only given the option to estimate the open meter reading orders. It is not showing me the implausible one. Please let me know if I have missed any configuration. Also if any alternate transaction would cater my requirement

 

Moderator note - comment removed

 

 

 

Thanks,Madhurima.

 

Message was edited by: William Eastman


SAP Electronic Bank Statement Configuration in FICA - FSCD

Hi, I am well aware of SAP EBS configuration in FICO. But I am required to do it in a FSCD now.

Could you please let me know the additional steps to configure and upload the electronic bank statement in FSCD.

If the check lots are not maintained in SAP FICO, how does the EBS post check clearing entries?

Issue with Reset Clearing

Dear Folks,

 

There is a problem with reset clearing. problem is user has cleared a document with Reset clearing document. now we want that cleared item as a open item. when we tried to reset that cleared item it is showing "110000000820 is a reversal document or clearing reset - no new reset allowed".

 

so how can we make that cleared document as a open item. please guide me.

 

For further details plz find the attached Screen shorts.

 

Many thanks in advance.

 

Regards,

Sri

SAP Work Management - GIS Integration in a Utility industry

This document talks about the details of integration between SAP Plant Maintenance and GIS (any product by ESRI). The following details are covered in this topic

 

- Introduction

- Use of GIS system at a Utility

- Use of SAP ERP system at Utility

- SAP EAM Compatible Unit Solution

- Interface between sap gis system

- Business benefits of Integrating two systems 

 

Introduction:

 

In  recent years businesses have been striving to optimize their processes andimprove efficiency by using highly integrated ERP systems like SAP for work management/financial management and GIS for map based information management.   Many advances have been observed in both fields; however the integrationbetween these two systems is highly complex. This results in lost opportunities
to leverage spatial analysis capabilities of GIS and highly integrated business management tools of ERP systems such as SAP. This paper discusses theindividual capabilities of each system and the integration approach of SAP ERP
system with GIS. The paper discusses the benefits gained from SAP/GIS  integration and highlights the major integration aspects involved in theseprocesses. We will also consider the technical approach used for interfacing the two systems. This paper will focus mainly on integration between SAP andAsset Management/Work Management (Plant Maintenance).

 

 

The following industries mainly make use of GIS systems:

 

 

  • Utilities – Water, Electric, Gas, Waste &
    Recycling
  • Energy – oil and gas production
  • Public Sector entities (like cities and
    states) also make extensive use of GIS systems

 

 

 

 

 

 

This paper focuses on the unique principles of a utility company but the principles would remain the same for other businesses.

 

 

The following are the main touch points between SAP and GIS from Utility perspective:

 

 

Asset Integration:

 

 

This is mainly used in the Utility and Construction Industry. The assets/equipments could be created in SAP and sent back to GIS.

 

The example of the above would be that a Utility pole could be created in SAP and then automatically represented in GIS. The GIS
users can directly view the ERP data of that pole in the GIS system.

 

 

Routing/Network Tracing:

 

 

This feature is mainly used by Service Providers:  Routing & Logistics industry, Utilities,Oil and Gas production etc.The ability to identify assets closest to addressinfo provided by caller – then be able to trace the network to see the flow of  the commodity (water, gas etc) and identify other customers that may bepotentially affected – e.g. nearest main and other addresses connected to thatmain

 

 

 

Design and Estimating:

 

 

The designs can be used in construction and Utility industry.The following are the main SAP touch points during integration:

 

  • Plant Maintenance – Equipment Master,
    Functional Location, Compatible Units, CU Design, Work Orders
  • Supply Chain – Material Master, Compatible
    Unit
  • Finance – Reconciliation (Indirect relation)

 

GIS in Utility Industry:

 

In the Utilities Industry, GIS is used for real time management of utilityinfrastructure and operations. It is a tool for map-based information
management, utility outages, creation of new assets (new construction jobs),field staking, inspection etc. In the Utilities industry, mapping and geographyare instrumental elements in most decision making processes. All of theprocesses around new infrastructure and outage management are driven by themaps. GIS brings together graphical representation of natural objects (e.g.trees, houses, wells, roads, etc), with attributes of these objects as well astools to manage the behavior of the map objects. This combination allows GIS togo far beyond the management of “background” mapping as it provides truepositional awareness in support of conducting analysis across multiple sources of information.

 

Whenit comes to integrating the GIS system with SAP, the following are the mainchallenges

 

  • Asset Identification and linking
  • Assembly units (basically the labor costs for Installs, Removals and material cost) in
    GIS used for new designs
  • New Asset creation and keeping the infrastructure for both systems in sync
  • Outage Management

 

 

The two main functions we are going to consider here in GIS system are

 

1. New Construction

2. Map updates

 

The main use of the GIS is for new construction jobs, i.e. staking the new job andbuilding new lines. The second important function is keeping the map in sync with the actual equipment out in the field.

 

Let us see the two different functions now, and the way they are performed in GISsystem

 

For the new construction jobs, GIS needs information for the labor and material for.the various actions they perform such as Install/Removals for the constructionThis information is maintained in terms of assembly units. Theinformation of assembly units is shipped from the enterprise application systemsuch as JDE, Maximo, SAP, etc.

 

New Construction jobs

 

The typical construction job is done,from take off pole location.The lines are constructed based on the pole locations above. Once the job is drawn with required assembly units, the system gives anassembly units listing along with the cost estimate report.

 

 

 

The second important function from GIS is to represent the structure or network of the installed equipment. The equipment is displayed
and managed on maps. The way the functionality is managed is referred as “MapEdit sessions” in GIS.

 

 

Use of SAP system at Utility:

 

SAP PlantMaintenance is one of the basic modules implemented by Utilities. The workmanagement functionality of master data management (Equipments and Functional location), Notification, Work Order management and Compatible units is used by a Utility


SAP implementations  increase the ability to make clear business decisions and eliminating processbottlenecks in the Utility industry.

 

 

Work Management – Helps organizations manage their assets more efficiently. It keeps the track of preventive and maintenance history and thus helps in decision making process around scrapping of an asset. In conjunction with Project system module it also helps to manage the complex projects using WBS, Compatible unitsetc.


SAP EAM Compatible Unit Solution:

 

The enterprise asset management module (under corporate services) helps in predictivemaintenance, maintenance cost budgeting, maintenance execution, and work-clearance management.

 

 

The Compatible Unit solution within SAP EAM helps mainly with construction work andacts as a tool for creating and maintaining equipment master data. Thisfunctionality resembles to GIS in that certain attributes of the equipmentmaster are maintained in both EAM as well as GIS.

 

 

Introduction to Compatible Unit Functionality:

 

 

  • Predefined standard design templates containing Materials, Labor, 
  • Resources and Tools required to completestandard Work Orders 
  • Example: Install,Remove, Transfer 40 feet pole.
  • New Service Installation.
  • CUs helps designers and engineers to more quickly and efficiently and estimate work to be performed
  • CUs are predominantly used by Utilities, but not exclusively

 

 

The overall design process in SAP is described below

 

CU Library:

 

 

See the attached document for image

 

The CU master  data carries the task list, classification andreference object type information.

 

 

CU Design:

 

 

See the image in attached for CU Design

 


CU design with different Compatible units and associated CU actions

 

Cost on CU Design:

 

See the image in attached document.


The cost estimation/reporting on CU design.

 

 

CU Work Order from Design:

Work Order created from CU design for execution of work (See the image for detailed CU process)

 

Equipment Master in SAP:

 

Equipment Master Data maintained in SAP

 

Classification data is maintained on Equipment

 

 

Interface Between SAP – GIS system:

 

The following Interfaces are typical between SAP EAM and GIS:

 

See the attached document for details

  • Outbound interface to send CU master data from SAP to UC (what’s UC??)
  • Outbound interface to send the equipment master data to UC
  • Inbound interface to create CU design from UC in SAP and update the same
  • Inbound interface to send the ‘AS BUILTS’from UC job to the SAP work order
  • Inbound interface to send equipment updates (change in characters or feeder) to SAP
  • One more Interface was set up with OMS system to create notifications on affected pieces of Equipment

Important Facts and Consideration for above interfaces:

 

Interface between SAP and GIS to maintain master data of Compatible Units – Outbound

 

  • This is an outbound interface sending out the data of the Compatible units from SAPto GIS system. The CUs will be required in GIS for new construction job
  • The important fields to be sent to GIS from SAP

       1.Compatible Unit id
       2. Cost associated with each CU. The major costs are labor cost on Install andremovals of Compatible unit for a job. This will also
           include the material cost.

Main considerations:

In order to synch the two systems it is recommended to maintain the same namingconvention for the Compatible Unit in both systems.

 

 

Interface between GIS and SAP to send the Compatible Unit design from SAP – Inbound

 

  • This is the most critical interface in the whole set up. This interface sends thenew design created in GIS to SAP.
  • As shown above in the screen shots, the GIS system creates new construction job (see image)basically on a feeder. The location 1 shown above is the take off polelocation, where the new construction begins. Each location on the feeder isdenoted by separate locations (location 2, location 3 etc) where the differentCompatible units are installed to complete the job.
  • Important fields to be sent from GIS to SAP

       1.Compatible Unit id
       2.   Quantity
       3.   CU Action
       4.   VCU (Locations)

       5.   Pri key id (the physical location or  X,Ycoordinates on GIS side)

       6.   Equipment Id (in case of existing equipments, equipment id will be maintained on GIS sidefrom SAP)

Main Considerations:

 

  • The CU Action and CU ids are important. The location (take off pole position –feeder id) i.e. the functional location in SAP is important for automaticcreation of new equipments (once the order is created)
  • The most important thing to take into consideration is that the functional locationhierarchy in SAP should not replicate the geographical locations on GIS side;otherwise it will become a nightmare to maintain two systems in synch. Thefunctional location on SAP side can be based on intelligent grouping ofEquipments, based on object types like Poles, Transformers etc. The feeder id
    can be maintained as a character on Equipment side, to identify the feeder/functional location on SAP.
  • The pri key id will act as a common identifier when the Equipment is created.


Interface between SAP and GIS to maintain technical object master data in synch – Outbound

  • Thisinterface will send the Equipment ids created from new construction job back toUC. The pri key id acts as a unique identifier between the two systems andplugs the unique Equipment id on GIS side.

 

Main Considerations:

  • As mentioned above the structure of functional location and equipment is veryimportant.The proposed structure will rely on GIS to
    update SAP with any permanent circuit changes. This will ensure that thefunctional location structure always remains accurate while still reflectingthe dynamic nature of the circuit network. This can be achieved by updating theindividual equipment’s distribution feeder number that will be stored as acharacteristic with the circuit change. Temporary circuit changes, such asseasonal load adjustment will not be reflected in SAP, since these are not permanent as-built changes to the network
  • The end-state structure
    should be Substation and Distribution Feeder driven. This will allow cost roll-up at the circuit level for
    better reliability investment decisions, as well as,
    providing better performance analysis.
  • The above will make sure that both systems are in synch. The Equipment id has to be maintained on the GIS side.

 

Interface between GIS and SAP to maintain technical object master data in synch – Inbound (Mapcorrections in GIS) 

 

  • This is an inbound interface. Map corrections/circuit changes always happen in GIS.It is required to maintain the structure in two systems in synch. Thisinterface basically sends the theme layer (object type of Equipment in SAP) and
    the associated attributes like pole height, class or the rating of thetransformer.


Main Considerations:

  • The main consideration is minimizing the attributes in SAP and GIS system. All theattributes in GIS system are not always required in SAP. Also the data comingfrom GIS should be classified as a new construction or a map correction job. This
    is important as in map corrections there will be no need of creating new equipments.


 

Benefits of integrating two systems:

 

  • Some Important benefits are as follows:

 

    • Increase asset data integrity
    • Effective financial reporting and meeting regulatory requirements
    • Increase end-user productivit
    • Increase work order manageability and reporting
    • Capitalize on information input into one system utilized in both with efficiency
    • Supply chain integration with work management

 

Increase Asset Data integrity

                - SAP and GIS databases reflect same data

                - Equipment number tracked in GIS
                - Eliminate lost, duplicate and obsoleteasset data

                 -Support reliable reporting and decisionmaking 

                - Proper tracking of refurbished equipment

 

Effective financial reporting and meeting regulatory requirements

                 - Automatic Financial reconciliation basedon the data from GIS

                 - Segregate the Capital and Operationexpenses on same job

                 - Effective Compliance to FederalReporting – FERC and other reporting requirements 

                 - Automated settlement to correct Asset

                 - Ability to capitalize (settle) workorder costs by expense type (labor, material, overhead etc). CAPEX and
                   OPEX distinguished

                 - Automation of  periodic asset transactions like assetunitizations, Cost of removal, retirements and other adjustment postings

 

Increase End User productivity:

                - Find SAP asset data (equipment)instantly from the map

                -View equipment details on the map

                - Create/update SAP assets from themap

                - Dynamically link map features toSAP assets in realtime

                - Doing job once in GIS and updatethem in SAP through interface

                - Submit ASBU (As Built) in GIS and update SAPwork order through interface

 

Increase work order manageability and reporting:

                - Automated process of creatingdesign in SAP

                - Multiple designs can be createdfor same job

                - Same jobs tied with ConstructionMeasure

                - ASBU (As Built updated) updatedon Work Order

 

Supply Chain integration with work management:

               - Compatible Units provide forstandardized planned and actual materials and costs on the work ord

               - Planning materials on work orders createsreservations in the warehouse which gives storekeepers  visibiltyto upcoming need

              - Scheduling of the work order materialsallows the Material Requirements Planning (MRP) portion of SAP to automate
                 replenishment of warehouse inventory

 

Learn more about this subject and more by registering for the SAP Utilities Forum North America in Huntington Beach, California, September 15-17th

select from EANL

Hello Experts,
Can you write the two queries into one. I want to avoid  hitting EANL twice.


I need to pull all the installations from EANL for a given premise. But at this point i dont have premise, but i have installation only.

i have anlage in lv_install.

 

1)select single vstelle into lv_prem from EANL where anlage = lv_install.

 

2) select anlage anlart into table it_eanl where vstelle = lv_prem (from 1 above)

 

pls suggest

Data exchange process in IDE

Dear All,

 

I am part of a project which implements IDE solution for a utility company in the de-regulated market. We plan to use the Data Exchange Process in IDE , I have gone through few documents on the same but stuck on the following points:

 

1. How to use the event modules for the IDOCs (for inbound process to identify the basic process and to call the data exchange controller ). Is it to be configured as the inbound function module for the particular IDoc type in partner profile ?

 

2. Where exactly the Data Exchange Format function module is called (to process the IDocs, ie to update the switch document with the message data)? I searched in the code level but in vain.

 

It would be of great help if somebody can address this.

 

Thanks in advance,

Abhilash.T

FPMA auto Clearing is not working.

Hi All,

 

FPMA auto Clearing is not working.

 

Scenario

 

Contract account is having open invoices and also open credit items. The total open invoice amount is equal to the total open credit items. So the contract account balance is ZERO.But the open credit items and open invoices are not having a clearing document because its not cleared. I have executed FPMA transaction with proper parameters but auto clearing is not happend.

 

Questions are:

 

1) what would be the reason behind not functioning the auto clearing

 

2) Job log of the FPMA program is showing exceptions ( some times with execption 6 and some times with 10,etc) . is there any table to check exceptions.

 

 

3) what is the diff between FPL9 ( account maintenance ) and FPMA auto clearing.

 

Regards,

 

Will

Update Register Group of a device with Rate Type and Fact Group (Single FM)

Hi Experts,

 

I have a requirement to update the Register Group of an installed device. The new Register Group has more number of registers than the earlier one.

 

So, while updating the Register Group (EG41), I have to update the Rate Type and Fact Group of the Registers in the new Register Group.

 

To update the Register Group I have the FM ISU_S_DEVICEMOD_CHANGE but this FM does not have Rate Type or Fact Group fields in the parameters.

 

I tried debugging EG41 transaction and found an FM ISU_O_DEVICEMOD_ACTION that creates new Logical Register Numbers at runtime for the new created Register as per the new Register Group. The logic that this FM is using is quite complicated and I am not sure whether using the same logic is safe or not.

 

I digged so many threads but didnt find the way to update Register Group along with Rate Type and Fact group through a single FM.

 

Please help, Moderator note - comment removed due to violation

 

Thanks,

Manoj

 

Message was edited by: William Eastman


TMD creation on single screen

HI experts,

 

My requirement is to create TMD (installation, CO, Premise, device location) on single screen

 

Kindly suggest me how to process.

 

Thank you in advance..

Regards,

Priya

Automatic Bar code and Credit Card info interpretation in FPCJ (Cash Journal)

Hello everyone,

 

We are trying to implement IS-U FI-CA module for a gas distribution company. There are  requirements to interpret credit card information from electronic card reader to credit card details tab in Cash journal (FPCJ),  also bar code information from electronic bar code reader.

 

As you know there are some standard events in FQEVENTS transaction code like 6060,6065. Anybody can explain us how we can handle this requirements by using these events.

 

Thanks in advance.

FPMA not working

Hello Experts,

 

As part of a new requirement, we have enhanced the Clearing of certain accounts using Event 110 .

After the enhancement, FP06 is working fine but FPMA is unable to display the Write Off Tolerances leading to error.

 

Any suggestions please?

 

Thanks,

Aneesha.

UCES Anonymous Move-In

Hi there,

 

Our customer need to allow their costumers reports a move-in when the customer is a new user and not has credentials to log on. I have read about this and it is supposed that the new user could access to the move-in service directly using the jsp jsp/isuExtensions/direct_logon_html.jsp. I have set the dummyUserMoveIn parameter at XCM with the same value used at  direct_logon_html.jsp (ESERVICE).

 

The problem is when try to access to http://%3cserver%3e%3cport%3ehttp://<server>:<port>/bdisu/jsp/isuextensions/direct_logon_html.jsphttp://nullthe server requests the credentials to log into the server.

 

Is necessary to do any other configuration?

 

 

Thanks in advance,

Kind regards,

 

Jordi.

Tolerance Limit check for a monthly portion

Hi Experts,

 

My client requirement is as follows :

 

Monthly Portion, hence period length = 1 month

Tolerance limit should be checked based on last 12 periods. It will be relative tolerance check.

 

However in SAP maximum comparison period is 9. Can anyone suggest a solution which can be met by configuration?

 

Waiting for an early response.

Thanks,

Madhurima

Posting area R001 for Payment on account

Hi, Experts!

 

I am trying to do Payment on account (in tcode FP05 for an item click buttons: Clarify Payment -> Post online -> On Account).

Error message appears: "Account determination not possible for key LE21  /      /01    /0060 /0010, posting area R001".

In my opinion:

- in Posting area R000 I define G/L account for Down payment (credit posting, amount with tax)

- in Posting area 0010 - G/L account for Tax on Sales (credit posting, tax)

  - in Posting area 0020 - G/L account for Offset tax (debit posting, tax)

  - also post (debit) on Bank account (amount with tax).

 

Why does Posting area R001 need?

If for tax determination, else which role does G/L account from this Posting area have?

 

 

Thanks in advance,

Dmitriy.

Bapi to Display to Contract

Hi,

 

I working on the web portal, and have the requirement to fetch the contract data like Utility type, start date,end date from the SAP.

But unable to figure out any bapi for the same.

 

Kindly suggest.

 

Regards,

AnUrAg


Using FKJOXTR

Hello Paul,

 

I have been trying to understand how to use transaction FKJOXTR.  I need no schedule 7 dependant jobs and couldn't find any documentation about how to use this transaction.  Can you give me some advice about it?

 

Regards,

Jaime

Questions related to Dunning Procedure Change

Hi Expert,

 

We currently have four dunning levels in one dunning procedure.  I am requested to remove the 3rd level, which is to generate a list for the external system to initiate IVR call.  What will be the implication on the dunning history and future dunning if I remove the current 3rd dunning level?  Can I renumber the current 4th dunning level, which is to generate a disconnection approval list and call event 360 to create notification, to 3rd dunning level, or should I keep the 4th number as is, without the 3rd level in place?  In addition to that, I am also requested to create a new dunning level after the current 4rd level.  This new dunning level will not be triggered by the number of days in arrears.  Instead, it needs to be triggered by the completion status of particular task of the notification generated at the current 4th dunning level.  Can I create this new dunning level by configuration?  It seems that the dunning level by configuration is only driven by the days in arrears.  If I need to use a event, which event will be used?  Do I still need to create a new dunning level through configuration?  If so, how do I connect the configured dunning level with the event?

 

Thank you very much for your time to answer my email.  Please let me know if you need any clarification.

 

Jennifer

CIC not supported in ECC

Hi all,

 

Would anyone know where I could possibly find a formal publication on when the  CIC in ERP is going out of maintenance?

 

I’ve seen the following links on SDN:

http://scn.sap.com/thread/963632 where it is mentioned “Just to let you know SAP may end support to CIC within ECC soon”

 

Found a note but it’s only applicable to CRM. I have not been able to find any specific release notes on this topic for ERP, unless I missed something.

Note 1330349 - ISUCRM: Transactions CRMD_ORDER and CIC0 no longer supported

 

I’ve also been filtering through the Product Availability Matrix and I'm not hitting any luck.

 

Can anyone assist with this information?

 

Regards,

Reg

Enhance search results in CIC0

Hello all,

 

When you search for a business partner in CIC0 (using ISUFINDER) and multiple results are found, a small dialog is shown.

This shows the possible results with the partner number and a short description. This short description is the ROLEICONSHORTTEXT attribute from business object ISUPARTNER.

 

 

Does anyone know if it's possible to change how the data is shown in this dialog? Can I for instance use a different attribute of the business object?

 

Kind regards,

Dieter

Advance payment interest calculation

Hi,

 

        We need to implement advance payment from customer functionality , for that we have planned to put advance payments made by customer as on account payments , which will get cleared (allocated) to bill generated for customer at later dates. But we have to calculate interest on the payment amount every six months . for that we have updated an interest key to the payments made by customer . now when we calculate interest on the payment only payment amount (Credit) which is open on the day of interest calculation , interest is calculated . but the item which has been cleared is not available for interest calculation . we are using FPI1 and FPINTM1 to calculate interest . Is there any way we can calculate interest on the cleared amount.

 

 

Example --

 

On-account payment - 1000  on 01.04.2013

 

partial clearing on 15.04.2013 with bill .

 

item-1--On-account payment - 700   (Open)

item-2--On-account payment - 300   (cleared)

 

currently system calculates interest on item 1

 

item-1--On-account payment - 700   (Open)  

 

what we need

interest calculation on

On-account payment - 1000  till 01.04.2013----15.04.2013 (because the item was open till this date )

On-account payment--  700        16.05.2013-- till interest run date (because its still open )

 

Is this functionality achievable using the FPI1 or FPINTM1

 

p.s

 

1) In the define interest key we have selected -- consider all items for interest calculation

2) In FPI1 we have selected option credit item and all items in interest parameters.